CANONICAL DOCUMENT // DOCTRINE.MD

Operating Doctrine

Revision v1.0.0 FROZEN (2026-10-03) // STATUS: BOOTSTRAP

"Decision rules for research, architecture, infrastructure, and governance. When principles conflict with execution pressure, the Doctrine decides."

The Eight Constitutional Decision Gates

GATE 01 // CORRECTABILITY

Reversibility & Blast-Radius Ceiling

No initiative may launch without a pre-registered blast radius and automated rollback verification. If recovery requires manual ad-hoc intervention, Gate 1 is violated.

GATE 02 // PRE-REGISTRATION

Epistemic Integrity vs. Goodhart/Campbell

Hypotheses and kill conditions must be timestamped before data collection. Evaluation harnesses must use held-out test sets to prevent metric gaming.

GATE 03 // EXIT DRILL

Mandatory External Portability

Every external dependency above the criticality threshold must maintain an executable exit drill. Zero vendor entrapment tolerated.

GATE 04 // THRESHOLD CROSSINGS

Architectural Shift Justification

Distributed systems, framework switches, or schema rewrites must produce measurable empirical advantage over simpler alternatives.

GATE 05 // CONTAINMENT

Control Independence in Autonomous Systems

Autonomous self-modifying loops must possess an isolated out-of-band termination path held by two independent reachable individuals.

GATE 06 // GALL'S LAW

Infrastructure Promotion

A complex system that works is invariably found to have evolved from a simple system that worked. Premature complexity is an institutional defect.

GATE 07 // FALSIFICATION

Kill Condition Precision

An initiative without a quantitative or decisive kill condition is not an experiment; it is an endless project. Falsification criteria must be unyielding.

GATE 08 // COMPOUNDING

Capability Ledger Verification

Artifacts must demonstrate reuse across distinct projects and measurably raise the baseline starting floor for subsequent teams.